Project

Spring Creek Stream and Wetland Mitigation Site

EPR served as the engineering firm and environmental lead for the design and assessment of approximately 16,000 linear feet of stream channels and 12 acres of wetland enhancement and restoration. Implemented to secure compensatory mitigation credits for our Client, EPR provided initial site evaluations to characterize degraded stream channels and evaluate soil and hydrologic conditions for wetland restoration. EPR developed detailed design plans and mitigation documents for stream and wetland components, secured approved permits and worked with the selected construction contractor to ensure the project was built according to the approved designs. Now in its fourth year of post-construction performance monitoring (also performed by EPR), the site is meeting all success criteria and on-track to provide the required stream and wetland mitigation credits.